MAJOR PROJECTS | ||
Company / Country | Nature of works | Place of works |
OMV PETROM- | The modernization of vacuum and air distillation plant in cooperation with Sulzer Chemtech LTD (Switzerland) | Romania |
The modernization of catalyst cracker, under a UOP Limited (England) design | Romania | |
The construction of a Independent Energetic Group, project by Hyundai (Korea) | Romania | |
Construction of tanks with fixed and floating roof in a range between 5000 and 50000 cu.m situated in the tank farm. Works included: pipe connections; access steel structures; sewerage systems; lighting installation. | Romania | |
Pipes systems and pipe connections for tanks | Romania | |
The execution of steel structures | Romania | |
Construction of 1000 cu.m. spherical tanks | ||
Major maintenance of vacuum and air distillation plant in cooperation | Romania | |
Major maintenance of Catalytic Reforming Unit | ||
The modernization of FCCU phase2, under Hamon Thermal Europe design | ||
BUTAN GAS S.A. ROMANIA | The modernization of gas-filling station at the Damaroaia Station - Bucharest: dismantling / assembling of equipment; pipes connections; the execution of steel structures; roof rehabilitation and various constructions. | Romania |
The construction of the pump house at the Damaroaia Station - Bucharest | Romania | |
External piping network connections at the Damaroaia Station - Bucharest | Romania | |
The construction of the LPG Station at Lugoj -Timisoara: assembling of equipment; piping systems; - fire extinguishing installation; main sewerage. | Romania | |
PETROTRANS S.A., ROMANIA | The construction of the pump house at Teleajen -Ploiesti tank fleet: pipes connections for tanks; steelworks; the assembling of pumps; the erection of equipment; sewerage system and constructions for industrial service; power supply installation; access roads. | Romania |
Sewerage system for industrial service at pump station Teleajen - Ploiesti | Romania | |
Pipeline for oil products transport - replacement of main diesel oil pipeline Ploiesti - Brasov | Romania | |
Upgrade operations of pipelines, main pipeline for oil products Pitesti - Brazi, pump station of Arpechim Pitesti Refinery | Romania | |
2 x 5000 cu. m. tanks with fixed roof at Buzau pump station, including: pipe connections; access steel structures; sewerage systems; lighting installation. | Romania | |
Capital repairing of 10000 cu. m. tanks with floating roof at Teleajen - Ploiesti | Romania | |
Construction of 20000 ,31000 and 50000 cu.m floating roof tanks in Petrotel tank farm | Romania | |
SHELL GAS, ROMANIA | The construction of the gas-filling station at Negoiesti -Prahova: assembling of equipment; piping systems; - fire extinguishing installation and various constructions; access roads. | Romania |
20 cu.m. propane vessels | Romania | |
NIGERIAN NATIONAL PETROLEUM COMPANY, NIGERIA | Tank farm Inspection and Assessment - Katuna Refinery a subsidiary of Nigerian National Petroleum Company | Nigeria |
Tank farm Inspection and Assessment - Port Harcourt Refinery a subsidiary of Nigerian National Petroleum Company | Nigeria | |
Tank Inspection - Mina and Suleja Depots Petroleum Product Marketing Company a subsidiary of Nigerian National Petroleum Company | Nigeria | |
Major maintenances and repairs of FCC Unit | Nigeria | |
PECO SA PLOIESTI, ROMANIA | Oil and diesel fuel supply installation | Romania |
ASTRA REFINERY S.A., ROMANIA | Pipes connections | Romania |
Fabrication and erections of tanks | ||
Fabrication and erection of equipments | ||
Steelworks | ||
Industrial constructions | ||
Fabrication and erection of 2 10 000 cu.m tanks | ||
ROMANIAN EFES BREWERY S.A., ROMANIA | Construction of New EFES Beer Unit Plant - as subcontractor | Romania |
LR ENERGY, DENMARK | Thermal energy conversion Project, EBRD - erection of heating agent and hot water pipelines in Ploiesti | Romania |
HME CONTRACTORS, DENMARK | Thermal energy conversion Project, EBRD - erection of heating agent and hot water pipelines in Ploiesti | Romania |
GLOBAL SPIRITS COMPANY ROMANIA | Stainless Steel tanks; manufacturing and erection | Romania |
Structural Steel for process plant | ||
pipe connections and equipment assembly | ||
DACIA Automobiles GROUPE RENAULT ROMANIA | cooling installation for welding robots | Romania |
Cooling Station- manufacturing and assembly | ||
Erection of installation for paint and wax distribution | ||
BANIAS REFINERY SYRIA | Major maintenance and replacement of flare head | Syria |
AZOMURES TARGU MURES | Major maintenance NH3 Plant | Romania |
AMURCO-BACAU ROMANIA | Ammonia Plant:Replace of the Reformer tube | Romania |
Urea Plant: Replace of the stripper and scrubber tubes | ||
Urea Plant:Erection of pipeline in the hydrolysis unit | ||
SC NITROPOROS SRL | Nitric Acid Plant: Manufacturingof heat exchangers | Romania |
NitricAacid Plant: Patching heat exchangers | ||
Ammonia Plant: peplacing tubes on the primary reformes | ||
Ammonia Plant: Patching on the absorber/desorbers | ||
Nitric Acid Plant: Metal construction works | ||
MAJOR PROJECTS ACHIEVED FROM the last 3 Years | ||
Company / Country | Nature of works | Place of works |
OMV PETROM | The modernization of vacuum and air distillation plant in cooperation with Sulzer Chemtech LTD (Switzerland) | Romania |
The modernization of catalyst cracker, under a UOP Limited (England) design | Romania | |
The construction of a Independent Energetic Group, project by Hyundai (Korea) | Romania | |
The modernization of FCCU phase2, under Hamon Thermal Europe design | Romania | |
PETROTEL LUKOIL REFINERY (PLK) PLOIESTI | UOP Platforming ProcessUnit 450 PPH UOP atmospheric CCR Section Major maintenance of the Coke Unit Amine treating unit MEA & DEA Manufacturing of heat exchangers |
Romania |
BUTAN GAS S.A. ROMANIA | The construction of the LPG Station at Lugoj -Timisoara: assembling of equipment; piping systems; - fire extinguishing installation; main sewerage. | Romania |
PETROTRANS S.A., ROMANIA | 2 x 5000 cu. m. tanks with fixed roof at Buzau pump station, including: pipe connections; access steel structures; sewerage systems; lighting installation. | Romania |
NIGERIAN NATIONAL PETROLEUM COMPANY, NIGERIA | Tank farm Inspection and Assessment - Katuna Refinery a subsidiary of Nigerian National Petroleum Company | Nigeria |
Tank farm Inspection and Assessment - Port Harcourt Refinery a subsidiary of Nigerian National Petroleum Company | Nigeria | |
Major maintenances and repairs of FCC Unit | Nigeria | |
BANIAS REFINERY SYRIA | Major maintenance and replacement of flare head | Syria |
AMURCO-BACAU ROMANIA | Ammonia Plant:Replace of the Reformer tube | Romania |
Urea Plant: Replace of the stripper and scrubber tubes | ||
Urea Plant:Erection of pipeline in the hydrolysis unit | ||
SC NITROPOROS SRL | Nitric Acid Plant: Manufacturing of heat exchangers | Romania |
Nitricacid Plant: Patching heat exchangers | ||
Ammonia Plant: peplacing tubes on the primary reformes | ||
Ammonia Plant: Patching on the absorber/desorbers | ||
Nitric Acid Plant: Metal construction works | ||
AZOMURES TARGU MURES | Major maintenance NH3 Plant | Romania |